A front door for everyone.

La Fab wants to open its doors to every member of the community. To reach this objective, an Accessibility Pavilion will be built. Our case for supporting this project: A gift toward Phase III to make La Fab accessible to all — channelled through the Chelsea Foundation’s Cultural Fund — brings the Accessibility Pavilion, and a fully accessible La Fab, one step closer to reality.

Support the Accessibility Pavilion — give at:
English: chelsea-foundation | CharityProfile | Donate Online  
French: chelsea-foundation | Profil de l’organisme | Faites un don en ligne

For nearly 150 years, the church at 8 chemin Mill has been a gathering place for Chelsea. Since 2021, La Fab has been giving it new life as an arts centre — and now it’s building the one thing the building has never had: a way in for every member of the community.

RENDERING – PHASE III, PROPOSED

La Fab, 8 chemin Mill with the Accessibility Pavilion

– About La Fab

From sanctuary to studio

La Fab — officially the Centre des arts, de la culture et du patrimoine de Chelsea, a solidarity cooperative — occupies the former Grace United Church, built in 1875 on land donated by the Meredith family. For close to 150 years the building served as a place of worship and, increasingly, as a hub of community life: recitals, lecture series, and gatherings that came to outlast the congregation itself.

By the early 2000s the congregation was shrinking. In 2014, a group of church women founded the Mill Road Community Space to keep the building alive as a rental venue, hosting the Gatineau Hills Fiddle Festival, open mic nights, the Chelsea Youth Choir, yoga, the Grace Quilting Group, songwriting workshops, and movie nights. In 2021, La Fab — a ten-year-old visual arts cooperative outgrowing its own space — purchased the building and began a four-year heritage restoration, completed in 2025, that conserved its nineteenth-century character while equipping it for a new life.

Today La Fab is a working home for regional visual and performing artists and artisans: studios, a gallery, a boutique, and a hall that hosts concerts, classes, and exhibitions year-round.

 

“The building is indicative of the progressive and charitable values of the United Church, as observed through their promotion of the space as a place for community events — and which will be continued by the new owner.”

 

Phase III Feasibility Report · Statement of Significance

– The problem

One thing the church still can’t do

The 1875 building was never built to be accessible, and the 2021–2025 restoration — focused on conserving the historic fabric — didn’t change that. There is no barrier-free entrance, and no elevator connecting the building’s levels.

For a centre whose mandate is to serve all of Chelsea, that gap is the one piece of the mission still unmet.

 

No barrier-free access

Current condition of the heritage building, per the 2026 code and accessibility review.

1 storey + basement

Both in active community use today — reachable only by stairs.

– Phase III

 The Accessibility Pavilion

In March 2026, La Fab engaged Juxta Architects — heritage-conservation specialists working with structural engineers BPA — to test two addition concepts against Chelsea’s heritage, zoning, building-code, and structural requirements. Their feasibility report, completed in September 2026, recommends an addition to the east and west sides of the church that solves the accessibility problem outright: a new accessible main entrance, a passenger elevator reaching every level, and universal and gender-neutral washrooms.

Just as important to La Fab’s board: this option maximizes new program space while keeping the historic church within its current building classification — avoiding a costly structural retrofit of the 1875 sanctuary and respecting the heritage value the building has carried since 1875.

 

Level New or renewed space Why it’s there
Main Accessible entry & reception The building’s first barrier-free front door
All Passenger elevator Connects main level to the lower level
113 Gallery Extended, two-room gallery More wall and floor space for exhibitions
112 Boutique Artisan boutique Sales space for member artists
Lower New artist studio Additional working space for residencies & classes
Lower Universal & gender-neutral washrooms Replaces the building’s only existing washroom bank
Lower Lounge / library A ground-level gathering space, fully accessible
 

 

Main level, recommended concept — new accessible entry, extended gallery, and boutique. Juxta Architects, 99% draft, September 2026.

Building section — the new elevator and stair core linking the historic sanctuary to the accessible lower level. Juxta Architects, 99% draft, September 2026.

– Why it matters

 

What full access means for Chelsea

La Fab already fills its calendar with the kind of programming this building has hosted for generations: concerts, exhibitions, classes, workshops, and meetings that carry on traditions like the Gatineau Hills Fiddle Festival and the Chelsea Youth Choir.

The Accessibility Pavilion doesn’t add new programming so much as it removes the last barrier to a wider participation — neighbours who use a wheelchair or a walker, parents with strollers, older residents, and the artists and artisans this building exists to support — reaching every room, on every level, through a front door built for them.

– Where things stand

From restoration to accessibility

 

2021–2025
Phase II — complete
Full heritage restoration of the 1875 church and its 1957 addition.
2026
Phase III design — complete
Heritage, code, zoning and structural feasibility study finalized by Juxta Architects, September 2026.
2026–2028
Fundraising
Grant and public fundraising, supported by the Chelsea Foundation’s Cultural Fund.
2027 Tender
Request for proposals issued for construction of the addition.
2028
Construction begins

Groundbreaking on the Accessibility Pavilion.
2030
Target completion

A fully accessible La Fab, open to all of Chelsea.

 

– Get involved

Help build the front door

In 2026, La Fab and the Chelsea Foundation established a partnership to channel charitable gifts toward Phase III through the Foundation’s Cultural Fund. Every gift raised brings the Accessibility Pavilion — and full access to La Fab for every member of the Chelsea community — closer to groundbreaking.

 

1875 → 2030

From the church’s founding to a fully accessible community arts centre

3

Building phases: restoration (complete), accessibility pavilion (underway), future theatre & studio wing